Except as provided otherwise in this chapter, a joint operating agency shall purchase any item or items of materials, equipment, or supplies, the estimated cost of which is more than $30,000 exclusive of sales tax, or order work for construction of generating projects and associated facilities, the estimated cost of which is more than $150,000 exclusive of sales tax if more than a single craft or trade is involved, or $75,500 exclusive of sales tax if only a single craft or trade is involved, by contract in accordance with RCW 54.04.070 and 54.04.080, which require sealed bids for contracts.
RCW 43.52.560
Contracts for materials or work required—Sealed bids.
2025 c 62 s 1; 2015 c 73 s 1; 2004 c 189 s 1; 1998 c 245 s 69; 1987 c 376 s 1.
Official source: Washington State Legislature. Reproduced from public-domain Washington statutes; confirm against the official source for the current text. Not legal advice.