Chapter
MISCELLANEOUS PROJECTS
- RCW 47.20.570— Manette bridge authorized.
- RCW 47.20.580— Washington State University highway authorized.
- RCW 47.20.590— University of Washington approach authorized.
- RCW 47.20.600— Washington State University highway, University of Washington approach—Acquisition of property.
- RCW 47.20.605— Washington State University highway, University of Washington approach—Public use.
- RCW 47.20.610— Washington State University highway, University of Washington approach—Condemnation.
- RCW 47.20.620— Washington State University highway, University of Washington approach—Measure of damage to buildings.
- RCW 47.20.630— Washington State University highway, University of Washington approach—Sale of buildings, personalty, acquired in acquisition of land.
- RCW 47.20.635— University of Washington approach—Ordinance requisite—Construction and maintenance.
- RCW 47.20.640— Reestablishment and redesignation of intersections when highway relocated.
- RCW 47.20.645— Interstate 90 corridor—Legislative finding.
- RCW 47.20.647— Interstate 90 corridor—Withdrawal of local governments from project—Effect on use of state funds.
- RCW 47.20.653— Interstate 90 corridor—Court proceedings, priority.
- RCW 47.20.700— State route No. 504 (Spirit Lake Memorial Highway)—Extension and parking facilities.
- RCW 47.20.710— Quinault Tribal Highway—Agreement authorized—Route.
- RCW 47.20.715— Quinault Tribal Highway—Maintenance, operation, improvements—Intersections, access.
- RCW 47.20.720— Quinault Tribal Highway—Certain portion as limited access.
- RCW 47.20.725— Quinault Tribal Highway—Acquisition of remaining right-of-way.
- RCW 47.20.730— Quinault Tribal Highway—Department as agent.
- RCW 47.20.735— Quinault Tribal Highway—Authority to seek federal funding.
- RCW 47.20.740— Lummi Nation public road—Agreement authorized—Route.
- RCW 47.20.743— Lummi Nation roadway—Department may proceed with design and construction.
- RCW 47.20.746— Lummi Nation roadway—Temporary easement—Governing authority of Lummi Nation.
- RCW 47.20.780— Design-build, progressive design-build, general contractor/construction manager procedures—Competitive bidding.
- RCW 47.20.785— Design-build, progressive design-build, and general contractor/construction manager procedures—Public works projects.
- RCW 47.20.900— Severability—1975 1st ex.s. c 272.