(a) Program Capability Document.—A program capability document for a major defense acquisition program shall identify and characterize—
(a) Program Capability Document.—A program capability document for a major defense acquisition program shall identify and characterize—
(1) the extent to which requirements for system performance are likely to evolve during the life cycle of the system because of evolving technology, threat, or interoperability needs; and
(1) the extent to which requirements for system performance are likely to evolve during the life cycle of the system because of evolving technology, threat, or interoperability needs; and
(2) for requirements that are expected to evolve, the minimum acceptable capability that is necessary for initial operating capability of the major defense acquisition program.
(2) for requirements that are expected to evolve, the minimum acceptable capability that is necessary for initial operating capability of the major defense acquisition program.
(b) Analysis of Alternatives.—The Director of Cost Assessment and Performance Evaluation, in formulating study guidance for analyses of alternatives for major defense acquisition programs and performing such analyses under section 139a(d)(4) of this title, shall ensure that any such analysis for a major defense acquisition program includes consideration of evolutionary acquisition, prototyping, and a modular open system approach.
(b) Analysis of Alternatives.—The Director of Cost Assessment and Performance Evaluation, in formulating study guidance for analyses of alternatives for major defense acquisition programs and performing such analyses under section 139a(d)(4) of this title, shall ensure that any such analysis for a major defense acquisition program includes consideration of evolutionary acquisition, prototyping, and a modular open system approach.
(c) Acquisition Strategy.—In the case of a major defense acquisition program that uses a modular open system approach, the acquisition strategy required under section 2431a of this title shall—
(c) Acquisition Strategy.—In the case of a major defense acquisition program that uses a modular open system approach, the acquisition strategy required under section 2431a of this title shall—
(1) clearly describe the modular open system approach to be used for the program;
(1) clearly describe the modular open system approach to be used for the program;
(2) differentiate between the major system platform and major system components being developed under the program, as well as major system components developed outside the program that will be integrated into the major defense acquisition program;
(2) differentiate between the major system platform and major system components being developed under the program, as well as major system components developed outside the program that will be integrated into the major defense acquisition program;
(3) clearly describe the evolution of major system components that are anticipated to be added, removed, or replaced in subsequent increments;
(3) clearly describe the evolution of major system components that are anticipated to be added, removed, or replaced in subsequent increments;
(4) identify additional major system components that may be added later in the life cycle of the major system platform;
(4) identify additional major system components that may be added later in the life cycle of the major system platform;
(5) clearly describe how intellectual property and related issues, such as technical data deliverables, that are necessary to support a modular open system approach, will be addressed; and
(5) clearly describe how intellectual property and related issues, such as technical data deliverables, that are necessary to support a modular open system approach, will be addressed; and
(6) clearly describe the approach to systems integration and systems-level configuration management to ensure mission and information assurance.
(6) clearly describe the approach to systems integration and systems-level configuration management to ensure mission and information assurance.
(d) Request for Proposals.—The milestone decision authority for a major defense acquisition program that uses a modular open system approach shall ensure that a request for proposals for the development or production phases of the program shall describe the modular open system approach and the minimum set of major system components that must be included in the design of the major defense acquisition program.
(d) Request for Proposals.—The milestone decision authority for a major defense acquisition program that uses a modular open system approach shall ensure that a request for proposals for the development or production phases of the program shall describe the modular open system approach and the minimum set of major system components that must be included in the design of the major defense acquisition program.
(A) the program incorporates clearly defined major system interfaces between the major system platform and major system components, between major system components, and between major system platforms;
(A) the program incorporates clearly defined major system interfaces between the major system platform and major system components, between major system components, and between major system platforms;
(B) such major system interfaces are consistent with the widely supported and consensus-based standards that exist at the time of the milestone decision, unless such standards are unavailable or unsuitable for particular major system interfaces; and
(B) such major system interfaces are consistent with the widely supported and consensus-based standards that exist at the time of the milestone decision, unless such standards are unavailable or unsuitable for particular major system interfaces; and
(C) the Government has arranged to obtain appropriate and necessary intellectual property rights with respect to such major system interfaces upon completion of the development of the major system platform; or
(C) the Government has arranged to obtain appropriate and necessary intellectual property rights with respect to such major system interfaces upon completion of the development of the major system platform; or
(2) in the case of a program that does not use a modular open system approach, that the use of a modular open system approach is not practicable.
(2) in the case of a program that does not use a modular open system approach, that the use of a modular open system approach is not practicable.
(f) Implementation Guidance.—The Secretaries of the military departments shall issue guidance to implement the requirements of this section.