14 U.S.C. § 581
Section 581 · Definitions
Current version, with additions and removals from the October 15, 2010 version.
In this chapter:
In this chapter:
(1) Appropriate congressional committees.—The term “appropriate congressional committees” means the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate.
(1) Appropriate congressional committees.—The term "appropriate congressional committees" means the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Commerce, Science, and Transportation of the Senate.
(2) Chief acquisition officer.—The term “Chief Acquisition Officer” means the officer appointed under section 56 of this title.
(2) Chief acquisition officer.—The term "Chief Acquisition Officer" means the officer appointed under section 56 of this title.
(3) Customer of a major acquisition program.—The term "customer of a major acquisition program" means the operating field unit of the Coast Guard that will field the system or systems acquired under a major acquisition program.
(A) an acquisition by the Coast Guard—
(A) an acquisition by the Coast Guard—
(i) the estimated life-cycle costs of which exceed $1,000,000,000; or
(i) the estimated life-cycle costs of which exceed $1,000,000,000; or
(ii) the estimated total acquisition costs of which exceed $300,000,000; or
(ii) the estimated total acquisition costs of which exceed $300,000,000; or
(B) any acquisition that the Chief Acquisition Officer of the Coast Guard determines to have a special interest—
(B) any acquisition that the Chief Acquisition Officer of the Coast Guard determines to have a special interest—
(i) due to—
(i) due to—
(I) the experimental or technically immature nature of the asset;
(I) the experimental or technically immature nature of the asset;
(II) the technological complexity of the asset;
(II) the technological complexity of the asset;
(III) the commitment of resources; or
(III) the commitment of resources; or
(IV) the nature of the capability or set of capabilities to be achieved; or
(IV) the nature of the capability or set of capabilities to be achieved; or
(ii) because such acquisition is a joint acquisition.
(ii) because such acquisition is a joint acquisition.
(A) the estimated life-cycle costs of which are equal to or less than $1,000,000,000, but greater than $300,000,000; or
(A) the estimated life-cycle costs of which are equal to or less than $1,000,000,000, but greater than $300,000,000; or
(8) Major acquisition program.—The term "major acquisition program" means an ongoing acquisition undertaken by the Coast Guard with a life-cycle cost estimate greater than or equal to $300,000,000.
(A) to develop, produce, and deploy a new asset to meet identified operational requirements; and
(A) to develop, produce, and deploy a new asset to meet identified operational requirements; and
(B) to manage cost, schedule, and performance of the acquisition, project, or program.
(B) to manage cost, schedule, and performance of the acquisition, project, or program.
(A) the testing of a capability or asset and the subsystems of the capability or asset to determine whether they meet all contractual performance requirements, including technical performance requirements, supportability requirements, and interoperability requirements and related specifications; and
(A) the testing of a capability or asset and the subsystems of the capability or asset to determine whether they meet all contractual performance requirements, including technical performance requirements, supportability requirements, and interoperability requirements and related specifications; and
(B) the evaluation of the results of such testing.
(B) the evaluation of the results of such testing.
(A) the testing of a capability or asset and the subsystems of the capability or asset, under conditions similar to those in which the capability or asset and subsystems will actually be deployed, for the purpose of determining the effectiveness and suitability of the capability or asset and subsystems for use by typical Coast Guard users to conduct those missions for which the capability or asset and subsystems are intended to be used; and
(A) the testing of a capability or asset and the subsystems of the capability or asset, under conditions similar to those in which the capability or asset and subsystems will actually be deployed, for the purpose of determining the effectiveness and suitability of the capability or asset and subsystems for use by typical Coast Guard users to conduct those missions for which the capability or asset and subsystems are intended to be used; and
(B) the evaluation of the results of such testing.
(B) the evaluation of the results of such testing.