The Secretary concerned shall specify the boundaries of each right-of-way as precisely as is practical. Each right-of-way shall be limited to the ground which the Secretary concerned determines (1) will be occupied by facilities which constitute the project for which the right-of-way is granted, issued, or renewed, (2) to be necessary for the operation or maintenance of the project, (3) to be necessary to protect the public safety, and (4) will do no unnecessary damage to the environment. The Secretary concerned may authorize the temporary use of such additional lands as he determines to be reasonably necessary for the construction, operation, maintenance, or termination of the project or a portion thereof, or for access thereto.
The Secretary concerned shall specify the boundaries of each right-of-way as precisely as is practical. Each right-of-way shall be limited to the ground which the Secretary concerned determines (1) will be occupied by facilities which constitute the project for which the right-of-way is granted, issued, or renewed, (2) to be necessary for the operation or maintenance of the project, (3) to be necessary to protect the public safety, and (4) will do no unnecessary damage to the environment. The Secretary concerned may authorize the temporary use of such additional lands as he determines to be reasonably necessary for the construction, operation, maintenance, or termination of the project or a portion thereof, or for access thereto.
Each right-of-way or permit granted, issued, or renewed pursuant to this section shall be limited to a reasonable term in light of all circumstances concerning the project. In determining the duration of a right-of-way the Secretary concerned shall, among other things, take into consideration the cost of the facility, its useful life, and any public purpose it serves. The right-of-way shall specify whether it is or is not renewable and the terms and conditions applicable to the renewal.
Each right-of-way or permit granted, issued, or renewed pursuant to this section shall be limited to a reasonable term in light of all circumstances concerning the project. In determining the duration of a right-of-way the Secretary concerned shall, among other things, take into consideration the cost of the facility, its useful life, and any public purpose it serves. The right-of-way shall specify whether it is or is not renewable and the terms and conditions applicable to the renewal.
Rights-of-way shall be granted, issued, or renewed pursuant to this subchapter under such regulations or stipulations, consistent with the provisions of this subchapter or any other applicable law, and shall also be subject to such terms and conditions as the Secretary concerned may prescribe regarding extent, duration, survey, location, construction, maintenance, transfer or assignment, and termination.
Rights-of-way shall be granted, issued, or renewed pursuant to this subchapter under such regulations or stipulations, consistent with the provisions of this subchapter or any other applicable law, and shall also be subject to such terms and conditions as the Secretary concerned may prescribe regarding extent, duration, survey, location, construction, maintenance, transfer or assignment, and termination.
The Secretary concerned prior to granting or issuing a right-of-way pursuant to this subchapter for a new project which may have a significant impact on the environment, shall require the applicant to submit a plan of construction, operation, and rehabilitation for such right-of-way which shall comply with stipulations or with regulations issued by that Secretary, including the terms and conditions required under section 1765 of this title.
The Secretary concerned prior to granting or issuing a right-of-way pursuant to this subchapter for a new project which may have a significant impact on the environment, shall require the applicant to submit a plan of construction, operation, and rehabilitation for such right-of-way which shall comply with stipulations or with regulations issued by that Secretary, including the terms and conditions required under section 1765 of this title.
The Secretary concerned shall issue regulations with respect to the terms and conditions that will be included in rights-of-way pursuant to section 1765 of this title. Such regulations shall be regularly revised as needed. Such regulations shall be applicable to every right-of-way granted or issued pursuant to this subchapter and to any subsequent renewal thereof, and may be applicable to rights-of-way not granted or issued, but renewed pursuant to this subchapter.
The Secretary concerned shall issue regulations with respect to the terms and conditions that will be included in rights-of-way pursuant to section 1765 of this title. Such regulations shall be regularly revised as needed. Such regulations shall be applicable to every right-of-way granted or issued pursuant to this subchapter and to any subsequent renewal thereof, and may be applicable to rights-of-way not granted or issued, but renewed pursuant to this subchapter.
Mineral and vegetative materials, including timber, within or without a right-of-way, may be used or disposed of in connection with construction or other purposes only if authorization to remove or use such materials has been obtained pursuant to applicable laws or for emergency repair work necessary for those rights-of-way authorized under section 1761(c) of this title.
Mineral and vegetative materials, including timber, within or without a right-of-way, may be used or disposed of in connection with construction or other purposes only if authorization to remove or use such materials has been obtained pursuant to applicable laws or for emergency repair work necessary for those rights-of-way authorized under section 1761(c) of this title.
(1) The Secretary concerned shall promulgate regulations specifying the extent to which holders of rights-of-way under this subchapter shall be liable to the United States for damage or injury incurred by the United States caused by the use and occupancy of the rights-of-way. The regulations shall also specify the extent to which such holders shall indemnify or hold harmless the United States for liabilities, damages, or claims caused by their use and occupancy of the rights-of-way.
(1) The Secretary concerned shall promulgate regulations specifying the extent to which holders of rights-of-way under this subchapter shall be liable to the United States for damage or injury incurred by the United States caused by the use and occupancy of the rights-of-way. The regulations shall also specify the extent to which such holders shall indemnify or hold harmless the United States for liabilities, damages, or claims caused by their use and occupancy of the rights-of-way.
(2) Any regulation or stipulation imposing liability without fault shall include a maximum limitation on damages commensurate with the foreseeable risks or hazards presented. Any liability for damage or injury in excess of this amount shall be determined by ordinary rules of negligence.
(2) Any regulation or stipulation imposing liability without fault shall include a maximum limitation on damages commensurate with the foreseeable risks or hazards presented. Any liability for damage or injury in excess of this amount shall be determined by ordinary rules of negligence.
Where he deems it appropriate, the Secretary concerned may require a holder of a right-of-way to furnish a bond, or other security, satisfactory to him to secure all or any of the obligations imposed by the terms and conditions of the right-of-way or by any rule or regulation of the Secretary concerned.
Where he deems it appropriate, the Secretary concerned may require a holder of a right-of-way to furnish a bond, or other security, satisfactory to him to secure all or any of the obligations imposed by the terms and conditions of the right-of-way or by any rule or regulation of the Secretary concerned.
The Secretary concerned shall grant, issue, or renew a right-of-way under this subchapter only when he is satisfied that the applicant has the technical and financial capability to construct the project for which the right-of-way is requested, and in accord with the requirements of this subchapter.