Public-domain · open source
OpenJurist

33 U.S.C. § 2332

Section 2332 · Flood mitigation and riverine restoration program

Current version, with additions and removals from the December 11, 2000 version.

Current — January 4, 2025
As of December 11, 2000
(a) In general
(a) In general

The Secretary may carry out studies and projects to—

(1) reduce flood and hurricane and storm damage hazards; or

The Secretary may undertake a program for the purpose of conducting projects to reduce flood hazards and restore the natural functions and values of rivers throughout the United States.
(2) restore the natural functions and values of rivers and shorelines throughout the United States.
(b) Studies and projects
(b) Studies and projects

(1) Authority

(1) Authority

(A) Studies

In carrying out the program, the Secretary may conduct studies to identify appropriate flood damage reduction, conservation, and restoration measures and may design and implement projects described in subsection (a) of this section.
In carrying out subsection (a), the Secretary may carry out studies to identify appropriate measures for—

(i) the reduction of flood and hurricane and storm damage hazards, including measures for erosion mitigation and bank stabilization; or

(ii) the conservation and restoration of the natural functions and values of rivers and shorelines.

(B) Projects

Subject to subsection (f)(2), in carrying out subsection (a), the Secretary may design and implement projects described in subsection (a).

(2) Consultation and coordination

(2) Consultation and coordination

The studies and projects carried out under this section shall be conducted, to the maximum extent practicable, in consultation and coordination with the Federal Emergency Management Agency and other appropriate Federal agencies, and in consultation and coordination with appropriate State and local agencies and tribes.

The studies and projects carried out under this section shall be conducted, to the maximum extent practicable, in consultation and coordination with the Federal Emergency Management Agency and other appropriate Federal agencies, and in consultation and coordination with appropriate State and local agencies and tribes.

(3) Nonstructural approaches

(3) Nonstructural approaches

The studies and projects shall emphasize, to the maximum extent practicable and appropriate, nonstructural approaches to preventing or reducing flood damages.
The studies and projects shall emphasize, to the maximum extent practicable and appropriate, nonstructural approaches to preventing or reducing flood and hurricane and storm damages, including the use of natural features or nature-based features.

(4) Participation

(4) Participation

The studies and projects shall be conducted, to the maximum extent practicable, in cooperation with State and local agencies and tribes to ensure the coordination of local flood damage reduction or riverine and wetland restoration studies with projects that conserve, restore, and manage hydrologic and hydraulic regimes and restore the natural functions and values of floodplains.
The studies and projects shall be conducted, to the maximum extent practicable, in cooperation with State and local agencies and tribes to ensure the coordination of local flood and hurricane and storm damage reduction or riverine, shoreline, and wetland restoration studies with projects that conserve, restore, and manage hydrologic and hydraulic regimes and restore the natural functions and values of floodplains and coastal barriers.
(c) Cost-sharing requirements
(c) Cost-sharing requirements

(1) Studies

(1) Studies

Studies conducted under this section shall be subject to cost sharing in accordance with section 2215 of this title.
Studies conducted under this section shall be subject to cost sharing in accordance with section 2215 of this title, except that the first $200,000 of the costs of a study conducted under this section shall be at Federal expense.
(2) Environmental restoration and nonstructural flood control projects
(2) Environmental restoration and nonstructural projects

(A) In general

(A) In general

The non-Federal interests shall pay 35 percent of the cost of any environmental restoration or nonstructural flood control project carried out under this section.

Design and construction of a project under this section that includes a nonstructural measure, a natural feature or nature-based feature, or an environmental restoration measure, shall be subject to cost sharing in accordance with section 2213 of this title, except that the non-Federal share of the cost to design and construct such a project benefitting an economically disadvantaged community (including economically disadvantaged communities located in urban and rural areas) shall be 10 percent.

(B) Items provided by non-Federal interests

(B) Items provided by non-Federal interests

The non-Federal interests shall provide all land, easements, rights-of-way, dredged material disposal areas, and relocations necessary for such projects.

The non-Federal interests shall provide all land, easements, rights-of-way, dredged material disposal areas, and relocations necessary for such projects.

(C) Credit

(C) Credit

The value of such land, easements, rights-of-way, dredged material disposal areas, and relocations shall be credited toward the payment required under this paragraph.

The value of such land, easements, rights-of-way, dredged material disposal areas, and relocations shall be credited toward the payment required under this paragraph.

(3) Structural flood control projects
(3) Structural flood control or hurricane and storm damage reduction projects
Any structural flood control projects carried out under this section shall be subject to cost sharing in accordance with section 2213(a) of this title.
Any structural flood control or hurricane and storm damage reduction projects carried out under this section shall be subject to cost sharing in accordance with section 2213 of this title, except that the non-Federal share of the cost to design and construct such a project benefitting an economically disadvantaged community (including economically disadvantaged communities located in urban and rural areas) shall be 10 percent.

(4) Operation and maintenance

(4) Operation and maintenance

The non-Federal interests shall be responsible for all costs associated with operating, maintaining, replacing, repairing, and rehabilitating all projects carried out under this section.

The non-Federal interests shall be responsible for all costs associated with operating, maintaining, replacing, repairing, and rehabilitating all projects carried out under this section.

(d) Project justification
(d) Project justification

(1) In general

Notwithstanding any other provision of law or requirement for economic justification established under section 1962–2 of title 42, the Secretary may implement a project under this section if the Secretary determines that the project—
Notwithstanding any requirement for economic justification established under section 1962–2 of title 42, the Secretary may implement a project under this section if the Secretary determines that the project—
(A) will significantly reduce potential flood damages;
(1) will significantly reduce potential flood, hurricane and storm, or erosion damages;
(B) will improve the quality of the environment; and
(2) will improve the quality of the environment; and
(C) is justified considering all costs and beneficial outputs of the project.
(3) is justified considering all costs and beneficial outputs of the project.

(2) Establishment of selection and rating criteria and policies

(e) Areas for Examination
(A) In general
(1) In general

Not later than 180 days after August 17, 1999, the Secretary, in cooperation with State and local agencies and tribes, shall—

(i) develop, and submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate, criteria for selecting and rating projects to be carried out under this section; and

(ii) establish policies and procedures for carrying out the studies and projects undertaken under this section.

(B) Criteria

The criteria referred to in subparagraph (A)(i) shall include, as a priority, the extent to which the appropriate State government supports the project.

(e) Priority areas

In carrying out this section, the Secretary shall examine appropriate locations, including—

In carrying out this section, the Secretary shall examine appropriate locations, including—

(1) Pima County, Arizona, at Paseo De Las Iglesias and Rillito River;
(A) Pima County, Arizona, at Paseo De Las Iglesias and Rillito River;
(2) Coachella Valley, Riverside County, California;
(B) Coachella Valley, Riverside County, California;
(3) Los Angeles and San Gabriel Rivers, California;
(C) Los Angeles and San Gabriel Rivers, California;
(4) Murrieta Creek, California;
(D) Murrieta Creek, California;
(5) Napa River Valley watershed, California, at Yountville, St. Helena, Calistoga, and American Canyon;
(E) Napa River Valley watershed, California, at Yountville, St. Helena, Calistoga, and American Canyon;
(6) Santa Clara basin, California, at Upper Guadalupe River and Tributaries, San Francisquito Creek, and Upper Penitencia Creek;
(F) Santa Clara basin, California, at Upper Guadalupe River and Tributaries, San Francisquito Creek, and Upper Penitencia Creek;
(7) Pond Creek, Kentucky;
(G) Pond Creek, Kentucky;
(8) Red River of the North, Minnesota, North Dakota, and South Dakota;
(H) Red River of the North, Minnesota, North Dakota, and South Dakota;
(9) Connecticut River, New Hampshire;
(I) Connecticut River, New Hampshire;
(10) Pine Mount Creek, New Jersey;
(J) Pine Mount Creek, New Jersey;
(11) Southwest Valley, Albuquerque, New Mexico;
(K) Southwest Valley, Albuquerque, New Mexico;
(12) Upper Delaware River, New York;
(L) Upper Delaware River, New York;
(13) Briar Creek, North Carolina;
(M) Briar Creek, North Carolina;
(14) Chagrin River, Ohio;
(N) Chagrin River, Ohio;
(15) Mill Creek, Cincinnati, Ohio;
(O) Mill Creek, Cincinnati, Ohio;
(16) Tillamook County, Oregon;
(P) Tillamook County, Oregon;
(17) Willamette River basin, Oregon;
(Q) Willamette River basin, Oregon;
(18) Blair County, Pennsylvania, at Altoona and Frankstown Township;
(R) Blair County, Pennsylvania, at Altoona and Frankstown Township;
(19) Delaware River, Pennsylvania;
(S) Delaware River, Pennsylvania;
(20) Schuylkill River, Pennsylvania;
(T) Schuylkill River, Pennsylvania;
(21) Providence County, Rhode Island;
(U) Providence County, Rhode Island;
(22) Shenandoah River, Virginia;
(V) Shenandoah River, Virginia;
(23) Lincoln Creek, Wisconsin; and 1
(W) Lincoln Creek, Wisconsin;
(24) Perry Creek, Iowa;
(X) Perry Creek, Iowa;
(25) Lester, St. Louis, East Savanna, and Floodwood Rivers, Duluth, Minnesota;
(Y) Lester, St. Louis, East Savanna, and Floodwood Rivers, Duluth, Minnesota;
(26) Lower Hudson River and tributaries, New York;
(Z) Lower Hudson River and tributaries, New York;
(27) Susquehanna River watershed, Bradford County, Pennsylvania; and
(AA) Susquehanna River watershed, Bradford County, Pennsylvania;
(28) Clear Creek, Harris, Galveston, and Brazoria Counties, Texas.
(BB) Clear Creek, Harris, Galveston, and Brazoria Counties, Texas;
(f) Program review

(1) In general

The program established under this section shall be subject to an independent review to evaluate the efficacy of the program in achieving the dual goals of flood hazard mitigation and riverine restoration.

(2) Report

Not later than April 15, 2003, the Secretary shall submit to the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate a report on the findings of the review conducted under this subsection with any recommendations concerning continuation of the program.

(g) Maximum Federal cost per project

Not more than $30,000,000 may be expended by the United States on any single project under this section.

(CC) Ascension Parish, Louisiana;

(DD) East Baton Rouge Parish, Louisiana;

(EE) Iberville Parish, Louisiana;

(FF) Livingston Parish, Louisiana; and

(GG) Pointe Coupee Parish, Louisiana.

(2) Priority projects

In carrying out this section, the Secretary shall prioritize projects for the following locations:

(A) Delaware beaches and watersheds, Delaware.

(B) Louisiana Coastal Area, Louisiana.

(C) Great Lakes Shores and Watersheds.

(D) Oregon Coastal Area and Willamette River basin, Oregon.

(E) Upper Missouri River Basin.

(F) Ohio River Tributaries and their watersheds, West Virginia.

(G) Chesapeake Bay watershed and Maryland beaches, Maryland.

(H) City of Southport, North Carolina.

(I) Maumee River, Ohio.

(J) Los Angeles and San Gabriel Rivers, California.

(K) Kentucky River and its tributaries and watersheds.

(L) Shoreline of the State of Connecticut.

(M) Winooski River tributary watershed, Vermont.

(h) Procedure
(f) Procedure

(1) All projects

(1) All projects

The Secretary shall not implement any project under this section until—

The Secretary shall not implement any project under this section until—

(A) the Secretary submits to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a written notification describing the project and the determinations made under subsection (d)(1) of this section; and
(A) the Secretary submits to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a written notification describing the project and the determinations made under subsection (d)(1); and

(B) 21 calendar days have elapsed after the date on which the notification was received by the committees.

(B) 21 calendar days have elapsed after the date on which the notification was received by the committees.

(2) Projects exceeding $15,000,000

(A) Limitation on appropriations

No appropriation shall be made to construct any project under this section the total Federal cost of construction of which exceeds $15,000,000 if the project has not been approved by resolutions adopted by the Committee on Transportation and Infrastructure of the House of Representatives and the Committee on Environment and Public Works of the Senate.

(B) Report

For the purpose of securing consideration of approval under this paragraph, the Secretary shall submit a report on the proposed project, including all relevant data and information on all costs.

(i) Authorization of appropriations

(1) In general

There are authorized to be appropriated to carry out this section—

(A) $20,000,000 for fiscal year 2001;

(B) $30,000,000 for fiscal year 2002; and

(C) $50,000,000 for each of fiscal years 2003 through 2005.

(2) Full funding

All studies and projects carried out under this section from Army Civil Works appropriations shall be fully funded within the program funding levels provided in this subsection.

(2) Projects requiring specific authorization

If the Federal share of the cost to design and construct a project under this section exceeds $15,000,000, the Secretary may only carry out the project if Congress enacts a law authorizing the Secretary to carry out the project.

(g) Definitions

In this section:

(1) Economically disadvantaged community

The term "economically disadvantaged community" has the meaning given the term as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note).

(2) Natural feature; nature-based feature

The terms "natural feature" and "nature-based feature" have the meanings given those terms in section 2289a(a) of this title.

/33/usc/2332 · .json · Public domain