33 U.S.C. § 2332
Section 2332 · Flood mitigation and riverine restoration program
Current version, with additions and removals from the December 23, 2022 version.
The Secretary may carry out studies and projects to—
The Secretary may carry out studies and projects to—
(1) reduce flood and hurricane and storm damage hazards; or
(1) reduce flood and hurricane and storm damage hazards; or
(2) restore the natural functions and values of rivers and shorelines throughout the United States.
(2) restore the natural functions and values of rivers and shorelines throughout the United States.
(1) Authority
(1) Authority
(A) Studies
(A) Studies
In carrying out subsection (a), the Secretary may carry out studies to identify appropriate measures for—
In carrying out subsection (a), the Secretary may carry out studies to identify appropriate measures for—
(i) the reduction of flood and hurricane and storm damage hazards, including measures for erosion mitigation and bank stabilization; or
(i) the reduction of flood and hurricane and storm damage hazards, including measures for erosion mitigation and bank stabilization; or
(ii) the conservation and restoration of the natural functions and values of rivers and shorelines.
(ii) the conservation and restoration of the natural functions and values of rivers and shorelines.
(B) Projects
(B) Projects
Subject to subsection (f)(2), in carrying out subsection (a), the Secretary may design and implement projects described in subsection (a).
Subject to subsection (f)(2), in carrying out subsection (a), the Secretary may design and implement projects described in subsection (a).
(2) Consultation and coordination
(2) Consultation and coordination
The studies and projects carried out under this section shall be conducted, to the maximum extent practicable, in consultation and coordination with the Federal Emergency Management Agency and other appropriate Federal agencies, and in consultation and coordination with appropriate State and local agencies and tribes.
The studies and projects carried out under this section shall be conducted, to the maximum extent practicable, in consultation and coordination with the Federal Emergency Management Agency and other appropriate Federal agencies, and in consultation and coordination with appropriate State and local agencies and tribes.
(3) Nonstructural approaches
(3) Nonstructural approaches
The studies and projects shall emphasize, to the maximum extent practicable and appropriate, nonstructural approaches to preventing or reducing flood and hurricane and storm damages, including the use of natural features or nature-based features.
The studies and projects shall emphasize, to the maximum extent practicable and appropriate, nonstructural approaches to preventing or reducing flood and hurricane and storm damages, including the use of natural features or nature-based features.
(4) Participation
(4) Participation
The studies and projects shall be conducted, to the maximum extent practicable, in cooperation with State and local agencies and tribes to ensure the coordination of local flood and hurricane and storm damage reduction or riverine, shoreline, and wetland restoration studies with projects that conserve, restore, and manage hydrologic and hydraulic regimes and restore the natural functions and values of floodplains and coastal barriers.
The studies and projects shall be conducted, to the maximum extent practicable, in cooperation with State and local agencies and tribes to ensure the coordination of local flood and hurricane and storm damage reduction or riverine, shoreline, and wetland restoration studies with projects that conserve, restore, and manage hydrologic and hydraulic regimes and restore the natural functions and values of floodplains and coastal barriers.
(1) Studies
(1) Studies
Studies conducted under this section shall be subject to cost sharing in accordance with section 2215 of this title, except that the first $200,000 of the costs of a study conducted under this section shall be at Federal expense.
Studies conducted under this section shall be subject to cost sharing in accordance with section 2215 of this title, except that the first $200,000 of the costs of a study conducted under this section shall be at Federal expense.
(2) Environmental restoration and nonstructural projects
(2) Environmental restoration and nonstructural projects
(A) In general
(A) In general
Design and construction of a project under this section that includes a nonstructural measure, a natural feature or nature-based feature, or an environmental restoration measure, shall be subject to cost sharing in accordance with section 2213 of this title, except that the non-Federal share of the cost to design and construct such a project benefitting an economically disadvantaged community (including economically disadvantaged communities located in urban and rural areas) shall be 10 percent.
Design and construction of a project under this section that includes a nonstructural measure, a natural feature or nature-based feature, or an environmental restoration measure, shall be subject to cost sharing in accordance with section 2213 of this title, except that the non-Federal share of the cost to design and construct such a project benefitting an economically disadvantaged community (including economically disadvantaged communities located in urban and rural areas) shall be 10 percent.
(B) Items provided by non-Federal interests
(B) Items provided by non-Federal interests
The non-Federal interests shall provide all land, easements, rights-of-way, dredged material disposal areas, and relocations necessary for such projects.
The non-Federal interests shall provide all land, easements, rights-of-way, dredged material disposal areas, and relocations necessary for such projects.
(C) Credit
(C) Credit
The value of such land, easements, rights-of-way, dredged material disposal areas, and relocations shall be credited toward the payment required under this paragraph.
The value of such land, easements, rights-of-way, dredged material disposal areas, and relocations shall be credited toward the payment required under this paragraph.
(3) Structural flood control or hurricane and storm damage reduction projects
(3) Structural flood control or hurricane and storm damage reduction projects
Any structural flood control or hurricane and storm damage reduction projects carried out under this section shall be subject to cost sharing in accordance with section 2213 of this title, except that the non-Federal share of the cost to design and construct such a project benefitting an economically disadvantaged community (including economically disadvantaged communities located in urban and rural areas) shall be 10 percent.
Any structural flood control or hurricane and storm damage reduction projects carried out under this section shall be subject to cost sharing in accordance with section 2213 of this title, except that the non-Federal share of the cost to design and construct such a project benefitting an economically disadvantaged community (including economically disadvantaged communities located in urban and rural areas) shall be 10 percent.
(4) Operation and maintenance
(4) Operation and maintenance
The non-Federal interests shall be responsible for all costs associated with operating, maintaining, replacing, repairing, and rehabilitating all projects carried out under this section.
The non-Federal interests shall be responsible for all costs associated with operating, maintaining, replacing, repairing, and rehabilitating all projects carried out under this section.
Notwithstanding any requirement for economic justification established under section 1962–2 of title 42, the Secretary may implement a project under this section if the Secretary determines that the project—
Notwithstanding any requirement for economic justification established under section 1962–2 of title 42, the Secretary may implement a project under this section if the Secretary determines that the project—
(1) will significantly reduce potential flood, hurricane and storm, or erosion damages;
(1) will significantly reduce potential flood, hurricane and storm, or erosion damages;
(2) will improve the quality of the environment; and
(2) will improve the quality of the environment; and
(3) is justified considering all costs and beneficial outputs of the project.
(3) is justified considering all costs and beneficial outputs of the project.
(1) In general
(1) In general
In carrying out this section, the Secretary shall examine appropriate locations, including—
In carrying out this section, the Secretary shall examine appropriate locations, including—
(A) Pima County, Arizona, at Paseo De Las Iglesias and Rillito River;
(A) Pima County, Arizona, at Paseo De Las Iglesias and Rillito River;
(B) Coachella Valley, Riverside County, California;
(B) Coachella Valley, Riverside County, California;
(C) Los Angeles and San Gabriel Rivers, California;
(C) Los Angeles and San Gabriel Rivers, California;
(D) Murrieta Creek, California;
(D) Murrieta Creek, California;
(E) Napa River Valley watershed, California, at Yountville, St. Helena, Calistoga, and American Canyon;
(E) Napa River Valley watershed, California, at Yountville, St. Helena, Calistoga, and American Canyon;
(F) Santa Clara basin, California, at Upper Guadalupe River and Tributaries, San Francisquito Creek, and Upper Penitencia Creek;
(F) Santa Clara basin, California, at Upper Guadalupe River and Tributaries, San Francisquito Creek, and Upper Penitencia Creek;
(G) Pond Creek, Kentucky;
(G) Pond Creek, Kentucky;
(H) Red River of the North, Minnesota, North Dakota, and South Dakota;
(H) Red River of the North, Minnesota, North Dakota, and South Dakota;
(I) Connecticut River, New Hampshire;
(I) Connecticut River, New Hampshire;
(J) Pine Mount Creek, New Jersey;
(J) Pine Mount Creek, New Jersey;
(K) Southwest Valley, Albuquerque, New Mexico;
(K) Southwest Valley, Albuquerque, New Mexico;
(L) Upper Delaware River, New York;
(L) Upper Delaware River, New York;
(M) Briar Creek, North Carolina;
(M) Briar Creek, North Carolina;
(N) Chagrin River, Ohio;
(N) Chagrin River, Ohio;
(O) Mill Creek, Cincinnati, Ohio;
(O) Mill Creek, Cincinnati, Ohio;
(P) Tillamook County, Oregon;
(P) Tillamook County, Oregon;
(Q) Willamette River basin, Oregon;
(Q) Willamette River basin, Oregon;
(R) Blair County, Pennsylvania, at Altoona and Frankstown Township;
(R) Blair County, Pennsylvania, at Altoona and Frankstown Township;
(S) Delaware River, Pennsylvania;
(S) Delaware River, Pennsylvania;
(T) Schuylkill River, Pennsylvania;
(T) Schuylkill River, Pennsylvania;
(U) Providence County, Rhode Island;
(U) Providence County, Rhode Island;
(V) Shenandoah River, Virginia;
(V) Shenandoah River, Virginia;
(W) Lincoln Creek, Wisconsin;
(W) Lincoln Creek, Wisconsin;
(X) Perry Creek, Iowa;
(X) Perry Creek, Iowa;
(Y) Lester, St. Louis, East Savanna, and Floodwood Rivers, Duluth, Minnesota;
(Y) Lester, St. Louis, East Savanna, and Floodwood Rivers, Duluth, Minnesota;
(Z) Lower Hudson River and tributaries, New York;
(Z) Lower Hudson River and tributaries, New York;
(AA) Susquehanna River watershed, Bradford County, Pennsylvania;
(AA) Susquehanna River watershed, Bradford County, Pennsylvania;
(BB) Clear Creek, Harris, Galveston, and Brazoria Counties, Texas;
(BB) Clear Creek, Harris, Galveston, and Brazoria Counties, Texas;
(CC) Ascension Parish, Louisiana;
(CC) Ascension Parish, Louisiana;
(DD) East Baton Rouge Parish, Louisiana;
(DD) East Baton Rouge Parish, Louisiana;
(EE) Iberville Parish, Louisiana;
(EE) Iberville Parish, Louisiana;
(FF) Livingston Parish, Louisiana; and
(FF) Livingston Parish, Louisiana; and
(GG) Pointe Coupee Parish, Louisiana.
(GG) Pointe Coupee Parish, Louisiana.
(2) Priority projects
(2) Priority projects
In carrying out this section, the Secretary shall prioritize projects for the following locations:
In carrying out this section, the Secretary shall prioritize projects for the following locations:
(A) Delaware beaches and watersheds, Delaware.
(A) Delaware beaches and watersheds, Delaware.
(B) Louisiana Coastal Area, Louisiana.
(B) Louisiana Coastal Area, Louisiana.
(C) Great Lakes Shores and Watersheds.
(C) Great Lakes Shores and Watersheds.
(D) Oregon Coastal Area and Willamette River basin, Oregon.
(D) Oregon Coastal Area and Willamette River basin, Oregon.
(E) Upper Missouri River Basin.
(E) Upper Missouri River Basin.
(F) Ohio River Tributaries and their watersheds, West Virginia.
(F) Ohio River Tributaries and their watersheds, West Virginia.
(G) Chesapeake Bay watershed and Maryland beaches, Maryland.
(G) Chesapeake Bay watershed and Maryland beaches, Maryland.
(H) City of Southport, North Carolina.
(H) City of Southport, North Carolina.
(I) Maumee River, Ohio.
(I) Maumee River, Ohio.
(J) Los Angeles and San Gabriel Rivers, California.
(J) Los Angeles and San Gabriel Rivers, California.
(K) Kentucky River and its tributaries and watersheds.
(K) Kentucky River and its tributaries and watersheds.
(L) Shoreline of the State of Connecticut.
(M) Winooski River tributary watershed, Vermont.
(1) All projects
(1) All projects
The Secretary shall not implement any project under this section until—
The Secretary shall not implement any project under this section until—
(A) the Secretary submits to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a written notification describing the project and the determinations made under subsection (d)(1); and
(A) the Secretary submits to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a written notification describing the project and the determinations made under subsection (d)(1); and
(B) 21 calendar days have elapsed after the date on which the notification was received by the committees.
(B) 21 calendar days have elapsed after the date on which the notification was received by the committees.
(2) Projects requiring specific authorization
(2) Projects requiring specific authorization
If the Federal share of the cost to design and construct a project under this section exceeds $15,000,000, the Secretary may only carry out the project if Congress enacts a law authorizing the Secretary to carry out the project.
If the Federal share of the cost to design and construct a project under this section exceeds $15,000,000, the Secretary may only carry out the project if Congress enacts a law authorizing the Secretary to carry out the project.
In this section:
In this section:
(1) Economically disadvantaged community
(1) Economically disadvantaged community
The term "economically disadvantaged community" has the meaning given the term as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note).
The term "economically disadvantaged community" has the meaning given the term as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 (33 U.S.C. 2201 note).
(2) Natural feature; nature-based feature
(2) Natural feature; nature-based feature
The terms "natural feature" and "nature-based feature" have the meanings given those terms in section 2289a(a) of this title.
The terms "natural feature" and "nature-based feature" have the meanings given those terms in section 2289a(a) of this title.