50 U.S.C. § 2528
Section 2528 · Study on nuclear test readiness postures
Amended 4 times on record
Not later than March 1, 2009, and every odd-numbered year thereafter, the Secretary of Energy shall submit to the congressional defense committees a report on the nuclear test readiness of the United States.
Each report under subsection (a) shall include, current as of the date of such report, the following:
(1) An estimate of the period of time that would be necessary for the Secretary of Energy to conduct an underground test of a nuclear weapon once directed by the President to conduct such a test.
(2) A description of the level of test readiness that the Secretary of Energy, in consultation with the Secretary of Defense, determines to be appropriate.
(3) A list and description of the workforce skills and capabilities that are essential to carrying out an underground nuclear test at the Nevada Test Site.
(4) A list and description of the infrastructure and physical plant that are essential to carrying out an underground nuclear test at the Nevada Test Site.
(5) An assessment of the readiness status of the skills and capabilities described in paragraph (3) and the infrastructure and physical plant described in paragraph (4).
Each report under subsection (a) shall be submitted in unclassified form, but may include a classified annex.
Editorial notes U.S. Code · Office of the Law Revision Counsel
Codification
Section was formerly set out as a note under section 2121 of Title 42, The Public Health and Welfare, prior to renumbering by Pub. L. 108–136.
Amendments
2008—Pub. L. 110–181 amended section generally. Prior to amendment, section related to reports and biennial update reports on costs, programmatic issues, and other issues associated with sustaining the capability of the Department of Energy to conduct underground nuclear tests within specified time periods.
2000—Pub. L. 106–398 designated existing provisions as subsec. (a), inserted heading, and added subsec. (b).