50 U.S.C. § 2528
Section 2528 · Study on nuclear test readiness postures
Viewing 50 U.S.C. § 2528 as in effect on November 24, 2003. The text changed in 1 later edition (most recent January 28, 2008).
View current version →Not later than February 15, 1996, the Secretary of Energy shall submit to Congress a report on the costs, programmatic issues, and other issues associated with sustaining the capability of the Department of Energy—
(1) to conduct an underground nuclear test 6 months after the date on which the President determines that such a test is necessary to ensure the national security of the United States;
(2) to conduct such a test 18 months after such date; and
(3) to conduct such a test 36 months after such date.
(1) Not later than February 15 of each odd-numbered year, the Secretary shall submit to the congressional defense committees a report containing an update of the report required under subsection (a), as updated by any report previously submitted under this paragraph.
(2) Each report under paragraph (1) shall include, as of the date of such report, the following:
(A) A list and description of the workforce skills and capabilities that are essential to carry out underground nuclear tests at the Nevada Test Site.
(B) A list and description of the infrastructure and physical plant that are essential to carry out underground nuclear tests at the Nevada Test Site.
(C) A description of the readiness status of the skills and capabilities described in subparagraph (A) and of the infrastructure and physical plant described in subparagraph (B).
(3) Each report under paragraph (1) shall be submitted in unclassified form, but may include a classified annex.
Editorial notes U.S. Code · Office of the Law Revision Counsel
Codification
Section was formerly set out as a note under section 2121 of Title 42, The Public Health and Welfare, prior to renumbering by Pub. L. 108–136.
Amendments
2000—Pub. L. 106–398 designated existing provisions as subsec. (a), inserted heading, and added subsec. (b).